Deciding what to test first in a utility's grid equipment tracker
A Lean UX workshop helping a large utility decide what to fix first in the tool that tracks its grid equipment
My role
Lead product designer
- Employer
- World Wide Technology
- Client
- A large utility
- When
- June and July 2022
- Format
- Five days online, eleven people
- Coached one of the two small teams in a five-day Lean UX workshop, the one working on outages.
- Drew the wireframes for both ideas the teams chose, and narrated the storyboards, illustrated with a library of workshop assets I had helped build at World Wide Technology.
- Co-wrote the 83-page workshop book that the utility took away: the ranked hypotheses, the personas, the journey maps, the storyboards and the wireframes.
- 20 things everyone assumed, written down and rated for how much each mattered and how risky it was
- 19→10 hypotheses ranked down to a top ten, most with their passing bar written before any test
- Half of the top ten were about getting the tool to talk to other systems, not about screens
- 2 ideas sketched as storyboards and wireframes: Data Stewardship and the Incident Impact Diagram
Summary
A large utility keeps a list of the equipment that helps run its power grid in an in-house tool, and reliability rules say that list has to be right. Adding and updating records had gotten so clumsy that people copied the data out and worked on it somewhere else, so the official list kept falling behind.
Our job wasn't to redesign the tool. It was to sit down with the people who own it and use it, work out which fixes were worth building at all, and leave them with a way of doing that on their own next time.
Who was involved
- Stakeholders The managers with a real say in where the tool goes.
- Grid specialists Subject experts who know the grid.
- Everyday users People who use the tool every day to keep the equipment list.
- Two small teams The eleven people in the room split in two; I coached the one working on outages.

Context
The utility's in-house equipment tracker keeps a list of every network device, computer, piece of software and database that helps run its power grid. Reliability rules for the grid say that list has to be right.
The tracker did the basics. But as the records grew more detailed, people started avoiding the tool and working on copies elsewhere. Every copy left the official list further behind, and people trusted the data, and the tool, less. That put grid safety and the utility's ability to meet those rules at risk.
Research
Before the workshop, we sat down with the executive paying for it and the subject experts to agree, in one sentence, on the problem we were solving. We also wrote down 20 things everyone assumed about the business and its users, and rated each one for how much it mattered and how risky it would be to be wrong.
In the workshop, each team built a persona, a made-up but typical user the whole room agreed on: Sean, a telecom engineer who keeps the equipment records up to date, and Jason, an analyst who sorts out outages as they happen. Each team drew a journey map of one persona's week. The same pattern kept showing up: relief when a job got finished, and worry whenever they weren't sure the data was right.
Each dot is one belief, placed by how much it mattered and how much we actually knew. The top right corner is where being wrong would hurt most and we knew least, so that is where the research went first. Two beliefs landed there.
- Held up
- Partly held
- Didn't hold
- Never tested
| ID | Assumption | Certainty | Importance | Status |
|---|---|---|---|---|
| A1 | People copy equipment data out of the tracker to work on it elsewhere because adding and updating records in the tool is too clumsy. | High | Critical | ExploratoryParticipants described this in the workshop, and it framed the whole problem, but nobody measured it. |
| A2 | People who keep the equipment list trust it less whenever they can't be sure a record is right. | Medium | High | ExploratoryBoth journey maps showed relief when a job got done and worry whenever the data might be wrong, drawn from what participants said. |
| A3 | An outage diagram showing every affected service and connected device would cut half an hour off a typical outage fix for analysts like Jason. | Low | Critical | Not testedIt passed if someone could explain an outage's full damage in under five minutes; the utility got the test, and we have no result. |
| A4 | Letting analysts attach equipment records from the tracker to Incident Command messages would make outage communication faster and more complete. | Low | Critical | Not testedIt passed if someone could create and send outage details within five minutes in a usability test; no result came back to us. |
| A5 | Showing an accuracy score on each equipment record would help analysts act sooner after an outage report arrives. | Low | High | Not testedIts time target was never filled in and still reads X mins. |
| A6 | Keeping the list of applications open while a record opens beside it would fix Sean's worst moment, going through records one tab at a time. | Medium | High | Not testedThe idea came from Sean's journey map and was sketched as wireframes, but nobody measured it. |
| A7 | Most of the fixes worth building for the tracker would be changes to its screens. | Medium | High | Didn't holdHalf of the top ten hypotheses were about getting the tracker to talk to other systems, like the trouble-ticket system, not about screens. |

Design
The teams turned the assumptions into 19 hypotheses, best guesses written so they could be tested, each with the cheapest experiment that could check it and, for most, what would count as a pass. Both teams' hypotheses were ranked by how risky and how valuable each seemed, and the top ten were kept. Hypothesis #2, for example, promised to cut half an hour off a typical outage fix, and it passed if someone could explain an outage's full damage in under five minutes.
A real network outage on the last morning pulled several people away, so we moved the sketching session (a Design Studio) a week. I turned those sketches into wireframes for two of the ideas, Data Stewardship, for keeping the records tidy, and the Incident Impact Diagram, for seeing what an outage touches, and narrated each as a storyboard. The storyboards are drawn from a library of workshop assets I had helped build at World Wide Technology, so a team can tell a user's story without a week of illustration.



Outcomes
The utility left with a ranked list of ten hypotheses to test, most with their passing bar written in advance, and storyboards and wireframes to run the riskiest experiments with. Ranking the list also showed that the quiet assumption, that most fixes would be screen changes, didn't hold. It was good to learn that before anyone spent money building screens.
We didn't measure results, and I don't have any from the testing the utility did after my part ended.
Two personas, Sean the telecom engineer and Jason the outage analyst.
A one-sentence problem statement agreed beforehand with the paying executive and subject experts.